Quick Summary & Key Takeaways (Featured Snippet)
Total Corridor
58.19 km
Phase 2A + 2B
Stations
30 Stations
4 Major Hubs
Airport Transit
~65 Minutes
End-to-End Speed
Max Fare
₹60 - ₹90
NCMC / QR Ticketing
1. Blue Line Construction Phases & Corridor Alignment
The Blue Line serves as Bengaluru's most vital economic transit artery, directly unlocking mobility for over 800,000 tech employees working along the Outer Ring Road (ORR) and linking them seamlessly to Kempegowda International Airport:
Phase 2A: Central Silk Board to KR Puram (19.75 km)
Commercial Target: Mid-2027Spans 13 elevated stations along the Outer Ring Road tech corridor through HSR Layout, Bellandur, Ecospace, Kadubeesanahalli, Marathahalli, and Mahadevapura. Test runs on the Baiyappanahalli depot link commenced in 2026.
Phase 2B: KR Puram to KIA Airport Terminal (38.44 km)
Commercial Target: Late 2027 - 2028Spans 17 stations starting from KR Puram northward through Nagawara, Hebbal, Jakkur, Yelahanka, and Doddajala before terminating directly at Terminal 1 and Terminal 2 of Kempegowda International Airport.
2. Ground Construction Progress & Mainline Trial Runs
Watch the on-ground trial run progress and technical viaduct construction along the Outer Ring Road corridor:
3. Complete 30-Station Directory & Major Interchange Landmarks
Search through all 30 stations along the Blue Line route to locate interchange connections and nearby tech parks:
| # | Station Name | Phase | Station Type | Key Landmark / Interchange |
|---|---|---|---|---|
| 1 | Central Silk Board | Phase 2A | Elevated Interchange | Yellow Line Junction, HSR Layout |
| 2 | HSR Layout | Phase 2A | Elevated | Outer Ring Road, Agara Lake |
| 3 | Agara | Phase 2A | Elevated | Agara Flyover, Koramangala Link |
| 4 | Iblur | Phase 2A | Elevated | Sarjapur Road Junction, Bellandur Gate |
| 5 | Bellandur | Phase 2A | Elevated | Ecospace Tech Park, Central Mall |
| 6 | Kadubeesanahalli | Phase 2A | Elevated | Cisco, Prestige Tech Park |
| 7 | Kodibeesanahalli | Phase 2A | Elevated | Marathahalli Outer Ring Road |
| 8 | Marathahalli | Phase 2A | Elevated | Old Airport Road Junction Flyover |
| 9 | ISRO | Phase 2A | Elevated | HAL Heritage Centre, ISRO Vimanapura |
| 10 | Doddanekundi | Phase 2A | Elevated | Bagmane Tech Park, Ferns City |
| 11 | DRDO Sports Complex | Phase 2A | Elevated | Kaggadasapura Link, DRDO Phase II |
| 12 | Saraswathi Nagar | Phase 2A | Elevated | Mahadevapura Industrial Area |
| 13 | KR Puram | Phase 2A/2B | Elevated Interchange | Purple Line Interchange, SWR Railway Station |
| 14 | Kasturi Nagar | Phase 2B | Elevated | Benniganahalli, ORR North |
| 15 | Ramamurthy Nagar | Phase 2B | Elevated | Banaswadi Link, ITI Colony |
| 16 | HRBR Layout | Phase 2B | Elevated | Kalyan Nagar, CMR University |
| 17 | HBR Layout | Phase 2B | Elevated | Hennur Cross, Manyata Tech Park South |
| 18 | Nagawara | Phase 2B | Elevated Interchange | Pink Line Interchange, Manyata Embassy Tech Park |
| 19 | Veerannapalya | Phase 2B | Elevated | Nagawara Lake, Ring Road Flyover |
| 20 | Kempapura | Phase 2B | Elevated | Sindhi College, Sahakar Nagar |
| 21 | Hebbal | Phase 2B | Elevated Interchange | Orange Line, K-RIDE Suburban Rail, Bellary Road |
| 22 | Kodigehalli | Phase 2B | Elevated | Tatanagar, GKVK Campus Link |
| 23 | Jakkur Cross | Phase 2B | Elevated | Jakkur Aerodrome, Flying Club |
| 24 | Yelahanka | Phase 2B | Elevated Interchange | Yelahanka Old Town, Air Force Station |
| 25 | Bagalur Cross | Phase 2B | Elevated | Reva University, KIADB Aerospace Park |
| 26 | Bettahalasuru | Phase 2B | Elevated | ITC Factory, MVIT Cross |
| 27 | Doddajala | Phase 2B | Elevated | Doddajala Fort, Shettigere |
| 28 | Airport City | Phase 2B | Elevated | BIAL AeroCity, Commercial Hub |
| 29 | KIA Airport Terminal 1 | Phase 2B | Underground/At-Grade | Kempegowda International Airport T1 |
| 30 | KIA Airport Terminal 2 | Phase 2B | Underground/At-Grade | Garden Terminal T2 Arrivals |
4. Frequently Asked Questions (FAQs)
What is the total length and route of the Bangalore Metro Blue Line?
The Namma Metro Blue Line spans 58.19 kilometres across two construction packages: Phase 2A (Central Silk Board to KR Puram, 19.75 km along the Outer Ring Road) and Phase 2B (KR Puram to Kempegowda International Airport via Hebbal and Yelahanka, 38.44 km), making it the longest continuous metro corridor in Bengaluru.
When will the Blue Line open for commercial operations in Bengaluru?
BMRCL is executing a phased commercial commissioning strategy: Phase 2A (Silk Board to KR Puram) mainline test runs commenced in late 2025/early 2026 with commercial passenger service targeting mid-2027. The full airport link through Phase 2B up to KIA Airport Terminal is scheduled to operationalize between late 2027 and mid-2028.
How many stations are there on the Namma Metro Blue Line?
The Blue Line consists of 30 stations (28 elevated and 2 at-grade/underground near the airport terminal). Key interchange hubs include Central Silk Board (Yellow Line), KR Puram (Purple Line), Nagawara (Pink Line), and Hebbal (Orange Line / Suburban Rail).
How long will it take to travel from Central Silk Board to Bangalore Airport via Metro?
Operating with modern Communication-Based Train Control (CBTC) signaling at speeds up to 90 km/h, the end-to-end journey from Central Silk Board to KIA Airport Terminal is projected to take approximately 65 to 70 minutes, saving passengers over 1.5 to 2 hours of peak-hour road traffic gridlock.
What will be the metro fare from Silk Board or MG Road to Bangalore Airport?
Under BMRCL's progressive telescopic distance fare matrix, standard adult tokens/smart cards for the full 58 km corridor are projected to cap between ₹60 and ₹90, with contactless QR ticketing and NCMC card support across all automatic fare collection (AFC) gates.
Will the airport metro stations have flight check-in and baggage drop facilities?
Yes. BMRCL and Bangalore International Airport Limited (BIAL) are partnering to establish City Airport Terminal (CAT) check-in kiosks and baggage drop facilities at designated interchange hubs (such as KR Puram and Hebbal), allowing passengers to check luggage before boarding the train.