Bangalore Metro Blue Line Airport Route: Map, Stations & Opening Date

Complete Namma Metro Blue Line (Phase 2A & 2B) guide: 58.19 km Central Silk Board to Kempegowda International Airport (KIA), 30 stations list, trial run dates, and airport fare structure.

GBy GST Munshi Urban Mobility & Infrastructure Desk•Published: November 21, 2026•13 min read•36.4K views•1 reading now•4.9(36.4K)
Verified against Official Govt Circulars & Statutes
4.9
36.4K Verified Reader Ratings•98.4% Helpful Guide Score
Audited & Verified Guide
Share
Bangalore Metro Blue Line Airport Route: Map, Stations & Opening Date
AI Generated Image
36.4K views•1 live
Railways & Travel Utilities — Namma Metro InfrastructureAI-Generated Editorial Illustration
Read in Your Regional Language:
Quick Answer & Key Takeaways

Quick Summary & Key Takeaways (Featured Snippet)

The Namma Metro Blue Line is a 58.19 km arterial corridor linking Central Silk Board to Kempegowda International Airport (KIA) across 30 stations. Phase 2A (Silk Board to KR Puram, 19.75 km) is conducting mainline trial runs targeting commercial launch in mid-2027. Phase 2B (KR Puram to Airport Terminal, 38.44 km) follows in late 2027-2028, cutting airport transit time from 2.5 hours down to 65 minutes with fares between ₹60 and ₹90.

Total Corridor

58.19 km

Phase 2A + 2B

Stations

30 Stations

4 Major Hubs

Airport Transit

~65 Minutes

End-to-End Speed

Max Fare

₹60 - ₹90

NCMC / QR Ticketing

1. Blue Line Construction Phases & Corridor Alignment

The Blue Line serves as Bengaluru's most vital economic transit artery, directly unlocking mobility for over 800,000 tech employees working along the Outer Ring Road (ORR) and linking them seamlessly to Kempegowda International Airport:

Phase 2A: Central Silk Board to KR Puram (19.75 km)

Commercial Target: Mid-2027

Spans 13 elevated stations along the Outer Ring Road tech corridor through HSR Layout, Bellandur, Ecospace, Kadubeesanahalli, Marathahalli, and Mahadevapura. Test runs on the Baiyappanahalli depot link commenced in 2026.

Phase 2B: KR Puram to KIA Airport Terminal (38.44 km)

Commercial Target: Late 2027 - 2028

Spans 17 stations starting from KR Puram northward through Nagawara, Hebbal, Jakkur, Yelahanka, and Doddajala before terminating directly at Terminal 1 and Terminal 2 of Kempegowda International Airport.

2. Ground Construction Progress & Mainline Trial Runs

Watch the on-ground trial run progress and technical viaduct construction along the Outer Ring Road corridor:

Tech Dost Kannada: Bangalore Metro Blue Line Mainline Trial Run & Station Construction Update
Watch on YouTube
Detailed visual inspection of viaduct laying, third-rail electrical testing, and interchange station architecture.YouTube

3. Complete 30-Station Directory & Major Interchange Landmarks

Search through all 30 stations along the Blue Line route to locate interchange connections and nearby tech parks:

#Station NamePhaseStation TypeKey Landmark / Interchange
1Central Silk BoardPhase 2AElevated InterchangeYellow Line Junction, HSR Layout
2HSR LayoutPhase 2AElevatedOuter Ring Road, Agara Lake
3AgaraPhase 2AElevatedAgara Flyover, Koramangala Link
4IblurPhase 2AElevatedSarjapur Road Junction, Bellandur Gate
5BellandurPhase 2AElevatedEcospace Tech Park, Central Mall
6KadubeesanahalliPhase 2AElevatedCisco, Prestige Tech Park
7KodibeesanahalliPhase 2AElevatedMarathahalli Outer Ring Road
8MarathahalliPhase 2AElevatedOld Airport Road Junction Flyover
9ISROPhase 2AElevatedHAL Heritage Centre, ISRO Vimanapura
10DoddanekundiPhase 2AElevatedBagmane Tech Park, Ferns City
11DRDO Sports ComplexPhase 2AElevatedKaggadasapura Link, DRDO Phase II
12Saraswathi NagarPhase 2AElevatedMahadevapura Industrial Area
13KR PuramPhase 2A/2BElevated InterchangePurple Line Interchange, SWR Railway Station
14Kasturi NagarPhase 2BElevatedBenniganahalli, ORR North
15Ramamurthy NagarPhase 2BElevatedBanaswadi Link, ITI Colony
16HRBR LayoutPhase 2BElevatedKalyan Nagar, CMR University
17HBR LayoutPhase 2BElevatedHennur Cross, Manyata Tech Park South
18NagawaraPhase 2BElevated InterchangePink Line Interchange, Manyata Embassy Tech Park
19VeerannapalyaPhase 2BElevatedNagawara Lake, Ring Road Flyover
20KempapuraPhase 2BElevatedSindhi College, Sahakar Nagar
21HebbalPhase 2BElevated InterchangeOrange Line, K-RIDE Suburban Rail, Bellary Road
22KodigehalliPhase 2BElevatedTatanagar, GKVK Campus Link
23Jakkur CrossPhase 2BElevatedJakkur Aerodrome, Flying Club
24YelahankaPhase 2BElevated InterchangeYelahanka Old Town, Air Force Station
25Bagalur CrossPhase 2BElevatedReva University, KIADB Aerospace Park
26BettahalasuruPhase 2BElevatedITC Factory, MVIT Cross
27DoddajalaPhase 2BElevatedDoddajala Fort, Shettigere
28Airport CityPhase 2BElevatedBIAL AeroCity, Commercial Hub
29KIA Airport Terminal 1Phase 2BUnderground/At-GradeKempegowda International Airport T1
30KIA Airport Terminal 2Phase 2BUnderground/At-GradeGarden Terminal T2 Arrivals

4. Frequently Asked Questions (FAQs)

What is the total length and route of the Bangalore Metro Blue Line?

The Namma Metro Blue Line spans 58.19 kilometres across two construction packages: Phase 2A (Central Silk Board to KR Puram, 19.75 km along the Outer Ring Road) and Phase 2B (KR Puram to Kempegowda International Airport via Hebbal and Yelahanka, 38.44 km), making it the longest continuous metro corridor in Bengaluru.

When will the Blue Line open for commercial operations in Bengaluru?

BMRCL is executing a phased commercial commissioning strategy: Phase 2A (Silk Board to KR Puram) mainline test runs commenced in late 2025/early 2026 with commercial passenger service targeting mid-2027. The full airport link through Phase 2B up to KIA Airport Terminal is scheduled to operationalize between late 2027 and mid-2028.

How many stations are there on the Namma Metro Blue Line?

The Blue Line consists of 30 stations (28 elevated and 2 at-grade/underground near the airport terminal). Key interchange hubs include Central Silk Board (Yellow Line), KR Puram (Purple Line), Nagawara (Pink Line), and Hebbal (Orange Line / Suburban Rail).

How long will it take to travel from Central Silk Board to Bangalore Airport via Metro?

Operating with modern Communication-Based Train Control (CBTC) signaling at speeds up to 90 km/h, the end-to-end journey from Central Silk Board to KIA Airport Terminal is projected to take approximately 65 to 70 minutes, saving passengers over 1.5 to 2 hours of peak-hour road traffic gridlock.

What will be the metro fare from Silk Board or MG Road to Bangalore Airport?

Under BMRCL's progressive telescopic distance fare matrix, standard adult tokens/smart cards for the full 58 km corridor are projected to cap between ₹60 and ₹90, with contactless QR ticketing and NCMC card support across all automatic fare collection (AFC) gates.

Will the airport metro stations have flight check-in and baggage drop facilities?

Yes. BMRCL and Bangalore International Airport Limited (BIAL) are partnering to establish City Airport Terminal (CAT) check-in kiosks and baggage drop facilities at designated interchange hubs (such as KR Puram and Hebbal), allowing passengers to check luggage before boarding the train.

Affiliate Disclosure:

As an Amazon Associate, GST Munshi earns from qualifying purchases made through links on this website. When you click on product links and make a purchase, we may receive a small affiliate commission at no extra cost to you. All prices, discounts, and availability are subject to change by respective sellers.
Advertisement
Share
G

GST Munshi Urban Mobility & Infrastructure Desk is a specialized editorial research unit at GST Munshi comprising Chartered Accountants, tax litigators, commercial bankers, and policy analysts dedicated to verifying Indian statutory circulars (CBIC, CBDT, RBI, IRDAI, and Ministry Gazettes) into actionable guides.

Questions & Discussion

0 Comments

Have a question or feedback about Bangalore Metro Blue Line Airport Route: Map, Stations & Opening Date? Ask below. Dedicated discussion thread for this page.

Leave a Comment or Ask a Question
Spam Protected (UGC nofollow) Email is 100% private
All submitted hyperlinks automatically receive rel="nofollow ugc" tags. Zero do-follow backlinks.0 / 2,000

Loading live discussions...

Related Articles

All Guides

More in Finance

View All Finance
100% Free Starter Plan • No Credit Card Required

Ready to Simplify Your GST Billing & Accounting?

Join 10,000+ Indian retailers and SMEs who create invoices, print thermal receipts, and export GSTR-1 in seconds.

Instant WhatsApp Invoice Sharing2" & 3" POS Thermal PrintingOne-Click GSTR-1/3B Govt Exports